Télécharger Imprimer la page

EUROM Sunrise 2500 Manuel D'utilisation page 37

Publicité

Les langues disponibles

Les langues disponibles

Step 5
The heating cap can now be mounted on the stand. Always do this with 2 people.
One person holds the heating cap up. The other person leads the protruding part of
the heating cap into the hollow end-part of the stand in such a way that the holes
are aligned. While one person keeps the heating cap in this position, the other
person inserts the long M8x50 socket screw through the aligned openings in the
stand and the protruding part of the heating cap. Then fix the 2 M6x8 socket crews
in the heating cap. Tighten these screws in the screw thread to secure the
connection well. Follow steps 1, 2, 3 and 4 below.
Step 6
The electricity cable can be connected only after the
heating cap has been mounted onto the stand.
Attention: Before you continue, make sure that the
plug of the device is not in the wall socket. Connect
the male plug of the stand with the female plug of
the heating cap. Check to see that the small
projection and the recess are aligned correctly.
Tighten this connection firmly to ensure a waterproof
connection.
37

Publicité

loading

Ce manuel est également adapté pour:

335231