Inspection And Maintenance - TLV QuickTrap FX1 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

10. Inspection and Maintenance

Operational inspections should be performed at least twice per year, or as called for by trap
operating conditions. Steam trap failure may result in temperature drop in the equipment, poor
product quality or losses due to steam leakage.
CAUTION
Gasket(s)
Seal Ring
Valve Stem
Bimetal Element
Over-expansion and Return Springs
Screen
Valve Seat
Body, Cover
Disassembly/Reassembly (to reassemble, follow procedures in reverse)
Part & No.
Connector Bolt
Connector Gaskets
Cap Nut Gasket 21
Locknut 15
Cover 2
Cover Gasket 17
Adjusting Screw 4
Seal Ring 13
Snap Ring 11
Washer 6
Return Spring 10
Thrust Plate 20
Washer (5 sets) 6
Bimetal Element
(5 sets of 2 discs) 5
• Installation, inspection, maintenance, repairs, disassembly, adjustment
and valve opening/closing should be carried out only by trained
maintenance personnel.
• Before attempting to open the trap, close the isolation valves and wait
until the trap has cooled completely. Failure to do so may result in burns.
• Be sure to use the proper components and NEVER attempt to modify the
product.
Parts Inspection Procedure
Check for warping and damage
Check for scratches and wear
Check for scratches and wear
Check for wear and deformation
Check for wear
Check for clogging, corrosion or damage
Check for rust, scale, oil film wear or damage
Check inside for rust and scale
During Disassembly
Remove with a socket wrench
See separate instruction 10.1
Remove and clean sealing
surfaces
Remove with a spanner or socket
wrench
Remove with a spanner or socket
wrench
Remove and clean sealing
surfaces
Screw in by using a flat-head
screwdriver
Remove
Remove from the valve stem
Lift up and off from the valve stem Slide onto the valve stem
Remove from the valve stem
Remove from the valve stem by
lifting up and off
Lift up and off from the valve stem Slide onto the valve stem
Remove the bimetal element from
the valve stem by lifting up and off
Consult the table of tightening torques
and tighten to the proper torque
See separate instruction 10.1
Replace with a new gasket if warped or
damaged
Reattach and tighten
Line up spring pin in valve stem with
grooves cut into the adjusting screw as
cover is placed onto the body; consult
the table of tightening torques and
tighten to the proper torque
Replace with a new gasket; coat
surfaces with anti-seize
Be careful not to damage the seal ring
during reassembly
Replace with a new seal ring if damaged;
coat with heat resistant silicon grease
Reattach to the valve stem
Place on the valve stem
Slide onto the valve stem
Reassemble the bimetal elements,
paying special attention to the proper
orientation (the
outside, see Exploded View, p. 6)
― 12 ―
During Reassembly
marks on the
Continued on next page

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Trap unit x1

Table des Matières