16
Assembly the elevator linkage. Adjust the length for the fist step to 145mm. The fine adjustment
should be done with neutral servohorn and neutral rudder.
17
18
19
Assembly the cable for the pull /pull installation to 730mm. Please note that before you cut the
cable the eyelit should be only half way inserted in the ball link to adjust the tension.
Install the rod end to the servo horn of the rud-
derservo. Use Loctite.
ARF VERSION ONLY:
Set the servo with the transmitter to neutral
and install the servohorn. Use Loctite.
Install the ruddersero in the fuselage.
EN
25