Performing A Pressure Test In The Risers - GF JRGURED UP 3/4 Notice D'utilisation Et D'entretien

Masquer les pouces Voir aussi pour JRGURED UP 3/4:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Performing a pressure test in the risers

The pressure test must be performed
in accordance with the local regulations
and standards.
Please adhere to the specifications and
guidelines provided by the manufac-
turer of your installation system.
- Remove the by-pass plug (see Section 2).
- Slide the test adapter (Art. No. 1387.320) with
the shiny side first onto the by-pass plug until
it stops.
- Screw in the by-pass plug with attached test
adapter until it stops (see Section 2).
Remove the test adapter after the
pressure test. It can be reused for
further pressure tests. Therefore, it is
highly recommendable to store the test
adapter together with the installation
tool.
E
65

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

1380.320

Table des Matières