Receiver Power System Requirements - Spectrum AR10360T Guide De L'utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

EN
materials (e.g. turbine powered jets, scale aircraft with metalized finishes,
aircraft with carbon fuselages, etc.), the following advanced range check will
confirm that all receivers in the system are operating optimally as installed.
This advanced range check allows the RF performance of each receiver to
be evaluated independently. A telemetry-equipped Spektrum Transmitter is
required for the advanced range test.
1. Stand approximately 100 feet away from the model.
2. Face the model with the transmitter in your normal flying position and put
your transmitter into range test mode.
3. Have a helper position the model in various orientations (nose up, nose
down, nose toward the transmitter, nose away from the transmitter, etc.).
4. Observe the telemetry on your transmitter. Note any orientations that cause
higher fades or frame loss values. Perform this step for at least one minute.
5. Reposition any remote receivers showing higher fades as necessary.
6. Retest to verify satisfactory results.
7. Repeat as neccesary.
After one minute, advanced testing should yield:
H – 0 holds
F – Fewer than 10 frame losses
A, B, L – Fades will typically be fewer than 100. It's important to compare the
relative fades. If a particular receiver has a significantly higher numnber of
fades (2 to 3X) then the test should be redone. If the same results occur, move
the offending receiver to a different location.
TIP: Use the fade values for A to investigate the telemetry link performance.

Receiver Power System Requirements

Some of the power system components that affect the power supply to the
receiver include:
• Receiver battery pack (number of cells, capacity, cell type, state of charge).
• The ESC's capability to deliver adequate voltage to the receiver when the
servos demand high current
• The switch harness, battery leads, servo leads, regulators etc.
The AR10360T has a minimum operational voltage of 3.5 volts; it is highly
recommended the power system be tested per the guidelines below.
Recommended Power System Test Guidelines
We recommend performing the following tests on any new setup to verify pow-
er system performance:
1. View the receiver voltage during this test on your transmitter's telemetry screen.
2. Load the control surfaces (apply pressure with your hand) while monitoring
the voltage at the receiver.
3. The voltage should remain above 4.8 volts even when all servos are loaded.
18

Publicité

Table des Matières
loading

Produits Connexes pour Spectrum AR10360T

Table des Matières