Installation Preparations; Wall; Ceiling; Duct - Maico ECA 100 ipro Instructions De Montage Et Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

UK │ 5. Safety instructions

6. Installation preparations

6.1 Wall

The prescribed minimum distances
between the wall and the ceiling
shown in the figure must be
observed.
1. Make sure the housing has a level base.
2. Fit wall breakthrough or drill core hole.
Minimum diameter, 105 mm.
Recommendation: Fit wall sleeve
WH 100. Fit wall breakthrough with a
minimum diameter of 115 mm.
Use mounting plate ZM 11 for
rectangular wall breakthroughs.
3. Lay power cable (recessed) up to place of
installation, see above for spacing. Guide
the power cable at least 110 mm from
the wall.
16

6.2 Ceiling

Danger of short-circuits and
NOTICE
damage to unit if conden-
sation builds up in the fan
housing.
Thermally insulate ventilation
ducts in professional manner.
Allow for a condensation drain or
condensate collector in the riser.
Perform installation preparations as
described in Chapter 6.1.

6.3 Duct

1. Debur edges on the inside of the duct.
2. Perform installation preparations as
described in Chapter 6.1.

6.4 Fan

1. Unpack ECA and remove cover [6].
Unlock locking hooks ( arrow) with
screwdriver to loosen cover.
2. Fit foam strip supplied to connector in
centre.
The foam strip must be fitted to
ECA 100 ipro H and KH such that
the units do not draw in any
unwanted air from outside.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Eca 100 ipro vzcEca 100 ipro fEca 100 ipro hEca 100 ipro bEca 100 ipro kEca 100 ipro kvzc ... Afficher tout

Table des Matières