Operation: Switching On/Off; Technical Data; Transport, Storage; Installation Preparations - Maico HDR 10 Instructions De Montage Et Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

off in case of overload. The fan must remain
switched off long enough for the motor to cool
down, before starting the fan back up.
Depending on size and temperature
conditions, it may take up to 30 mi-
nutes to cool down. Only then can
the unit be switched back on.
EC units: The internal control electronics
prevent the fan from overheating/overload
(thermal fuse/thermal circuit breaker in motor
winding).

6. Operation: Switching on/off

The fan is switched on and off with a switch,
for example, with a suitable 3-step switch.
For accessories  Internet (www.maico-
ventilatoren.com). Ensure sufficient supply air
during operation.

7. Technical data

For technical data,  the rating plate [T].
For dimensions  Figure B.
For characteristic curves  Internet:
www.maico-ventilatoren.com.
Rated voltage
Power frequency
AC motor
EC motor
Degree of protection
Air volume
free outlet or
free inlet
Temperature class
Maximum air flow
temperature
Weight
230 V
50 Hz
50/60 Hz
IP 44
326 to 1850 m³/h,
depending on unit
type
B
50 °C
AC units 2.5 ... 5.5 kg
EC units 1.7 ... 4.6 kg
5. Product information │ UK

8. Transport, storage

8.1 Transport
WARNING
Danger if impermissible means of
transport or lifting gear are used.
Note weight and centre of gravity (centre).
Do not stand under a suspended load.
NOTICE
Risk of damage if means of transport are
incorrectly attached. Do not place load on
sensitive components, such as the impeller.
8.2 Storage
● Only store fan horizontally in a suitable,
dry room: Ambient temperature -10 to
+60 °C.
● Before installing it, check that the diagonal
fan is working properly.
● Maico accepts no liability for corrosion
damage caused by improper storage,
e.g. storage in a damp room.

9. Installation preparations

Important mounting
information
Fan operation only permitted with:
● permanent installation in flexible ducts with
folded spiral-seams ducts Ø 100 to Ø 250 mm
to suit the unit type (nominal size).
● permanent electrical supply cable.
● installation on a wall, ceiling or bracket of
sufficient load-bearing capacity.
7

Publicité

Table des Matières
loading

Table des Matières