After each readjustment always check that the screws are tightly
fixed so that safe operating of the drill rig is possible.
Mounting the turnstile
▪
Mount the turnstile (1) on the
right or left side of the
carriage (2) depending on the
work to be performed.
▪
Check whether the turnstile
(1) is fixed tightly.
Fastening of the Drill Rig
Fastening by means of dowels in concrete
Use
For brickwork, Brickwork-
Dowels must be used.
▪
Mark the position of the drill holes for the fastening
on the surface to be drilled.
▪
Drill a hole (Ø 16) 50 mm deep (A), into which the
dowel M12 (B) is to be placed; insert and secure
the dowel with the doweling tool (C).
▪
Screw the quick action clamping screw (D) into
the dowel.
▪
Install the drill rig.
▪
Fix the washer (E) and finally the fastening nut
(F) on the quick action clamping screw (D).
▪
Tighten the fastening nut (F) with a wrench SW
27.
▪
Before and after tightening the nut (F), the 4
adjustable screws have to be adjusted in order
to adapt the rig to the surface.
Do check whether the drill rig is
installed safely and firmly.
1
2
13
Klick