3. Disconnect the power plug of the product.
To reset the motor overload protection
1. Stop the product. Refer to
page 17 .
2. Remove the blockage from the drill bit.
3. Start the product. Refer to
page 16 .
To replace the drill bit
WARNING:
power outlet before you replace the drill bit.
WARNING:
the product become cool before you remove
the drill bit. The drill bit and the adjacent
area are very hot after operation.
WARNING:
that are approved for your product. Speak to
your Husqvarna dealer for more information.
1. Make sure that you have got a new drill bit, the
supplied wrench and water resistant grease.
2. Lock the spindle axle with the wrench.
3. Turn the drill bit clockwise to remove it.
Introduction
WARNING:
safety chapter before you do maintenance
on the product.
WARNING:
disconnect the power cord before you do
maintenance.
18
To stop the product on
To start the product on
Pull out the plug from the
Use protective gloves. Let
Only use diamond drill bits
Maintenance
Read and understand the
To prevent injury,
CAUTION:
to remove the drill bit. There is a risk
of damage to the gearbox and the drill
stand.
4. Lubricate the spindle shaft thread with water
resistant grease.
5. Turn the drill bit counterclockwise to install it. Tighten
fully.
Maintenance schedule
* = General maintenance done by the operator. The
instructions are not given in this operator's manual.
X = The instructions are given in this operator's manual.
Do not hit the product
1794 - 003 - 08.03.2024