Setting the scene.
90°
Slats
Projection
1137
5
1312
6
1487
7
5512
8
1837
9
2012
10
2187
11
2362
12
2537
13
2712
14
Mechanisation of water drainage and mechanisation of pole fixing.
This operation should only be carried out if the mechanisation has not been carried out by us.
coaxial with the posts. Make sure they are correctly positioned before drilling.
A
Position the mounting
plate
Attention,
Take into account the slope of your terrace when installing the pergola. Shim the ground fixing plates or
change the height at which you lay the pergola so that the structure is level at 0°.
Overall projection (HT)
X = Positioning the feet
X
Slats
1080mm
15
1255mm
16
1430mm
17
5455mm
18
1780mm
19
1955mm
20
2130mm
21
2305mm
22
2480mm
23
2655mm
24
B
Mark the holes.
Bracket Mounting plates
X
Projection
2887
2830mm
3062
3005mm
3237
3180mm
3412
3355mm
3587
3530mm
3762
3705mm
3937
3880mm
4112
4055mm
4287
4230mm
4462
4405mm
Evacuation to be carried out at each pole.
C
Drill 1xØ50mm + 4xØ9mm.
90°
Slats
Projection
4637
25
4812
26
4987
27
5162
28
4337
29
5512
30
5687
31
5862
32
6037
33
Attention,
the drainage systems are
X
4580mm
4755mm
4930mm
5105mm
5280mm
5455mm
5630mm
5805mm
5980mm
P. 5