Operating; Technical Data - Vetus PM111 Manuel D'utilisation Et Instructions D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 8
Cut the hole in the ship by sawing in polyester, aluminium or wood, or by acetylene cutting for
steel.
Remove all burrs carefully and smooth the edges.
These portholes have a clamp profile; fixing holes in the side of the ship are NOT necessary.
Apply a sufficient amount of sealant to ensure a good seal, see drawing 1, page 16.
Position the hatch in the hole.
Fixing Screws:
Use M4 screws in accordance with DIN965 (ISO7046) of DIN966 (ISO7047). Choose a screw length
related to the wall thickness, see Table in Drawing 1. D= Clamp Reach, L= Screw Length.
Fit screws and tighten securely.
4

Operating

To open:
Loosen the knobs by turning them to the left, tilt the knobs out of the way and open the win-
dow. The clamping hinge will hold the window open at the desired angle.
To close:
Press the window closed, tilt the knobs back and twist them shut again.
5
Maintenance
Clean anodized or powder-coated aluminium profiles regularly; 2 to 4 times a year, depending on
how dirty they get.
Use only neutral cleaning agents. NEVER use alkaline, acid and/or abrasive cleaners.
Protect the sealing rubbers with talcum powder.
Re-adjusting hinges:
Readjust the hinges if the lid no longer remains open.
A I Portholes:
Open the window fully and turn the screws as much as is needed, see drawing
2, page 16.
A III Portholes: Remove the plastic covers from the screws and tighten the screws (2 per hinge)
as much as is needed, see drawing 3, page 16.
6

Technical Data

Frame, backplate
: Aluminium (AlMgSi0.5)
Window
: PMMA 10 mm
vetus® Portholes PM, PW, PX, PZ
ENGLISH
5
070204.03

Publicité

Table des Matières
loading

Table des Matières