Télécharger Imprimer la page

GE GFD48 Manuel D'utilisation Et Instructions D'installation page 39

Publicité

Les langues disponibles

Les langues disponibles

STACKING THE WASHER AND
DRYER (if desired) (cont.)
STACKING KIT GEFLSTACK CONTENTS
(OPTIONAL ACCESSORY)
NOTE: Models with Built-In Pedesta
stacked.
Left hand bracket
Right hand bracket
4 rubber pads
TOOLS YOU WILL NEED
Phillips screwdriver
Open-ended wrench
Pliers
INSTALLATION PREPARATION
Remove the packaging.
Flatten the product carton to use as a pad to lay the
dryer down on its side. Continue using the carton to
protect the finished floor in front of the installation
location.
Installation Instructions
cannot be
l™
4 #12 x 1" screws
4 #8 x 1/2" screws
Gloves
Level
INSTALLING THE STACK BRACKET
KIT
REMOVE THE DRYER LEVELING LEGS
1
A. Carefully lay the dryer on its side. Use the
packing material so you don't scratch the finish
on the dryer.
B. Use an open-end wrench or pliers to remove the
dryer leveling legs.
Back out and
remove all 4
leveling legs
INSTALL RUBBER PADS TO DRYER
2
BASE
Locate the 4 rubber pads in the parts package.
Remove the adhesive backing and firmly place
over each bracket where you removed the
leveling legs.
39
Place pads over
all four leveling
leg brackets

Publicité

loading