GB
General technical approval/general
design approval
No. Z-40.21-565
(8) This decision takes account of the requirements for the item forming the subject of this
decision under water law. According to Section 63(4)(2) and (3) of the Wasserhaushaltsgesetz
(WHG) [German Federal Water Act]
therefore been deemed suitable under water law.
(9) The period of validity of this decision (see page 1) relates to its application for the
installation or positioning of the item forming the subject of this decision and not to its
2
Provisions for the building product
2.1
General
The Container and its components must comply with Sections 1 and 2 of the "Special
provisions", the annexes to this decision, and the information submitted to the Deutsches
Institut für Bautechnik.
2.2
Materials, properties and composition
2.2.1
Materials
Only the materials listed in Annex 2 may be used to manufacture the Container.
Structural details
2.2.2
The structural details of the Container must comply with Annexes 1.1 to 1.6 and the
information submitted to the Deutsches Institut für Bautechnik.
Stability
2.2.3
When used under the applicable conditions of use, the Container shall be structurally stable
up to an operating temperature of 40°C. A structural certification that takes account of the
effects of wind has not been provided.
Fire behaviour
2.2.4
(1) In the thickness in which it is to be applied, the material PE is normally flammable (building
material class B2 in accordance with DIN 4102-1)
(2) The Container described in this decision (consisting of an inner container and a collection
container) is designed to withstand the effects of fire for a duration of 30 minutes without
leakage in rooms within buildings that fulfil the building code requirements for boiler rooms
and heating oil storage areas.
Manufacturing, packaging, transport, storage and production labelling
2.3
Manufacturing
2.3.1
(1) The Container must be manufactured in accordance with the manufacturing specifications
submitted to the Deutsches Institut für Bautechnik.
(2) In the event that significant changes are made to the rotational moulding system (e.g. to
the rotational moulding tool), the certification body must be informed of this to enable it to
come to a decision with regard to any further action that may need to be taken (intervention
by the Deutsches Institut für Bautechnik, special inspections).
(3) The Containers may only be manufactured in the plant listed below using the same
production facilities as were used to manufacture the container that passed the initial
inspection:
CEMO GmbH
Kappelweg 2
91625 Schnelldorf, Germany
(4) The rotational sintering process is to be controlled in such a way that the moulding
compound is completely melted without being thermally damaged. Imperfections,
unacceptable accumulations of materials and cavities must be prevented.
8
Gesetz zur Ordnung des Wasserhaushalts [German Law on the Regulation of Water Resources]
(Wasserhaushaltsgesetz, WHG [German Federal Water Act]), 31 July 2009 (German Federal Law Gazette I p.
9
DIN 4102-1:1998-05
36
, the item forming the subject of this decision has
8
9
Fire behaviour of building materials and
Page 4 of 9 | 9 November 2023
.