the charging process is not influenced by
the light being switched on.
Insert the solar cable plug
electricity socket
Position the solar cell
section "Mounting the solar cell
Note: With steady exposure to sunlight,
the rechargeable battery is fully charged
after 4 to 6 days. The duration of the charg-
ing process depends on the charge state of
the rechargeable battery as well as the
quality of the exposure to sunlight.
Assembly
Note: Remove all packaging materials from the
product.
Before mounting, decide where you want to
Mount the solar cell
12
The solar cell
and the spotlight
12
mounted independently of each other, but after
being mounted must be connected with the ap-
prox. 5 m long power cable of the solar cell
After the mounting, lay the cable so it is not sub-
ject to any mechanical stresses. Use typical in-
stallation material such as cable clamps or
conduit to fasten the cable, to prevent damage
to the insulation.
Note: The included mounting material is suitable
for ordinary solid concrete or masonry construc-
tion. Other wall substrates may require other
fastening materials. Seek specialist advice if
necessary.
Mounting the spotlight
Make sure you will not be drilling into electrical,
gas or water lines inside the wall. Use a power
18 GB/IE
into the solar
14
of the spotlight
.
8
10
as described in
12
".
12
and the spotlight
10
can be
10
drill to drill the holes into the brick wall. Always
observe all safety instructions for the power drill
in the manual for the power drill. Death or injury
due to electric shock may otherwise result.
When selecting the mounting location for the
spotlight
, pay attention to the following:
10
Make sure the spotlight
desired area. You can move the spotlight
Make sure the motion detector
the desired area. The motion detector
has a maximum coverage range of 12 m,
with a coverage angle of about 180°
(depending on the mounting height – a
height of 1.8–2.5 m is ideal) (see Fig. D).
Make sure the motion detector
illuminated at night by street lighting. This
can influence its functioning.
Unscrew hinge joint
.
mounting bracket
Utilize the mounting bracket
for making the position of the two outer drill
holes.
.
Then drill these holes and attach the mount-
12
ing bracket
and screws
Now attach the spotlight
bracket
3
hinge joint
washer
6
spring washer
located as fig A.
Mounting the solar cell
Make sure you will not be drilling into electrical,
gas or water lines inside the wall. Use a power
drill to drill the holes into the brick wall. Always
observe all safety instructions for the power drill
illuminates the
10
9
9
to detach the
4
from the spotlight
3
as a template
3
using the supplied dowels
3
.
2
to the mounting
10
using the previously removed
, spring washer
4
5
. Please make sure that the
and flat washer
5
.
10
covers
9
is not
.
10
1
and flat
are
6