MBX 4..7 Shower
5. The following must be observed
The heater is installed as shown in the immediate vicinity of the outlet in a frost-free room. We
guarantee trouble-free operation only if CLAGE fittings and accessories are used. Note the fol-
lowing during installation:
EN
• Installation must comply with DIN VDE 0100 and EN 806 and all statutory regulations, as
well as those of the local electricity and water supply companies.
• Check technical data and the information on the rating plate under the cover (see chapter
"Removing the cover" on page 24).
• The supplied connection accessories must be used.
• Easy access to the appliance shall be guaranteed at all times. An external shut-off valve has
to be installed.
• Thoroughly rinse the water pipes before connection.
• Optimum operation is ensured at a water flow pressure of 0.2 to 0.4 MPa (2–4 bar). The
appliance must not be subjected to pressure exceeding 1 MPa (10 bar).
• For safe operation of this instantaneous water heater, a non return valve is not required. If,
nevertheless, a non return valve has to be installed, it may only be placed in the hot water
outlet line behind the instantaneous water heater.
• The minimum requirements for the required water resistance must be complied with. The
required water resistance of the can be obtained from your water supply company.
• When the device is operated with preheated water, it must be ensured that this tempera-
ture is limited to 55 °C.
20