C
B
7
8
Step.12
A. Unplug the LEV (CN60) and Thermistor (CN44) from the control
board and route the harness from control box area out through the
rubber grommet.
B. Remove the brackets which secure the coil assembly if not
1
already done.
2
C. Slide the coil assembly out of the air handler cabinet.
A
B
8
9
10
11
C
D
E
F
Step.13 Remove the Plate Guide Rear (3 screws) and Side Drain
G
Pan (4 screws) along with supporting brackets (4 screws) from the
coil assembly.
H
CORRECT
I
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
5/8"
J
(15mm)
1
2
8
9
10
11
A
9
10
3
4
5
6
The parts are required to meet the latest RoHS directive.
12
13
14
PLATE GUIDE REAR
INCORRECT
3
4
5
6
MITSUBISHI ELECTRIC CORPORATION
3D
DIM.mm
DATE
APPROVED
SCALE
DRAWN
0.200
CHECKED
NTS
DESIGNED
12
13
14
1
2
3
A
B
C
D
11
12
DETAIL B
E
F
G
7
8
9
10
H
15
16
A
I
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
Step.14a Install the (2) drain pan seals included in the accessory
B
bag as shown above. These seals will cover the unused holes in the
SIDE
J
side drain pan to prevent leaks.
DRAIN
PAN
1
2
3
C
D
PLATE
GUIDE
REAR
E
F
G
Step.14b Reinstall the brackets to the opposite side of the Side
Drain Pan. The Side Drain Pan will be reinstalled on the opposite
side of the Coil Assembly. Reattach the Plate Guide Rear on the
H
opposite side of the coil assembly.
PLASTIC TIE
7
8
9
10
ITEM
MODEL NAME
COMMERCIAL TOLERANCE
WORK
GRADE
I
CASTING
FINE COARSE
PRESS WORKING
A
B
C
D
E
GAS CUTTING
A
B
SHEARING
A
B
MACHINING
MEDIUMCOARSE
PLASTIC TUBE
CONFIDENTIAL
J
8
15
16
4
5
6
7
The parts are required to meet the latest RoHS directive.
13
14
CORRECT
PLASTIC TIE
11
12
13
14
PLASTIC TUBE
DETAIL B
DETAIL B
4
5
6
7
PIPING
MITSUBISHI ELECTRIC CORPORATION
DATE
APPROVED
DIM.mm
SCALE
DRAWN
0.200
CHECKED
NTS
DESIGNED
11
12
13
14
8
9
15
INCORREC
5/8"
15
(15mm)
16
A
B
C
D
8
9
E
SIDE
DRAIN
F
PAN
G
H
ITEM
MODEL NAME
COMMERCIAL TOLERANCE
WORK
GRADE
I
CASTING
FINE COARSE
PRESS WORKING
A
B
C
D
E
GAS CUTTING
A
B
SHEARING
A
B
MACHINING
MEDIUMCOARSE
3D
CONFIDENTIAL
J
8
15
16
13