DETAIL A
2
3
4
5
The parts are required to meet the latest RoHS directive.
SECURE WIRE
HARNESS WITH
THE 4 ZIP TIES
FROM
ACCESSORY BAG
NOTE: Thermistor wire must not touch the cooper tubes at the time
to make the routing.
Step. 4b Cut the plastic ties that are securing the extra wiring
for the LEV (CN60) and Thermistor (CN44). Route the LEV and
thermistor wires into the Electrical section of the air handler on the
left side of the coil.
- Secure thermistor wire as shown DETAIL A with the provided zip
ties.
-The notch in the drain pan allows the wires to pass the drain pan,
go through the sheetmetal shelf which now supports the Coil
Assembly and enter the Electrical section of the Air Handler.
Reconnect the LEV (CN60) and Thermistor (CN44) to the control
2
3
board.
4
5
16
6
7
8
9
DETAIL A
DETAIL A
DETAIL A
6
7
8
9
DRIP LOOP
INSIDE
DRAIN PAN
USING
PROVIDED
ZIP TIES
TO ELECTRICAL
SECTION
Step. 4c In order to prevent water from running down the
Thermistor wires into the electrical area, a Drip Loop MUST be
installed to direct water into the drain pan using the provided
zip ties of the accessory bag.
10
11
12
13
3rd
1st
2nd
Step. 5 Reinstall the panels over the drains and refrigerant lines.
Next, install the panels which cover the Coil (1
Blower (3
) and Filter (4
rd
th
Assembly will be installed upright as the original vertical orientation
from the factory, while the other panels' text will read upside down.
MITSUBISHI ELECTRIC CORPORATION
DATE
DIM.mm
SCALE
DRAWN
1:5
CHECKED
NTS
DESIGNED
10
11
12
13
14
15
16
A
4th
B
C
D
E
PRIMARY DRAIN
3/4" FPT
F
G
H
), Electrical (2
st
). NOTE: The panel which covers the Coil
ITEM
MODEL NAME
COMMERCIAL TOLERANCE
WORK
GRADE
I
CASTING
FINE COARSE
PRESS WORKING
A
B
C
D
E
GAS CUTTING A
B
SHEARING
A
B
MACHINING
MEDIUM COARSE
3D
CONFIDENTIAL
APPROVED
J
12
14
15
16
),
nd