Télécharger Imprimer la page

GiBiDi SL530 Instructions Pour L'installation page 18

Publicité

Les langues disponibles
  • FR

Les langues disponibles

18
UK
FINAL TESTS
Close the gearmotor casing (29).
Power the system and run a complete opening and closing cycle checking that:
• the gate moves smoothly.
• the safety devices function properly.
• the foundation plate is firmly in place.
• the gate assembly is in compliance with the current EN 12453 EN 12445 standards (or the equivalent or native
standards of the country of installation).
• for further details and information on the reference standards, visit our site:
www.gibidi.com
MAINTENANCE
Periodically check the gate structure, in particular:
• check perfect functioning of the rails.
• check that the rack has not lowered with the weight of the gate, since it would weigh down on the gearmotor.
Should this be the case, raise the rack and retighten the screws lower down in the slot, or lower the gearmotor
using the adjusting screws (15).
• every 6 months check good functioning of the safety devices.
• unlock the operator and check that there are no points of friction along the entire travel of the gate.
• check proper functioning of the unlocking device (see the relative paragraph).
• check that there is no dirt or fragments on the pinion.
Gi.Bi.Di. S.r.l. reserves the right to change the technical data without prior notice in relation to product development.
SL

Publicité

loading

Ce manuel est également adapté pour:

Sl serie