Assembling And Disassembling The Cot; Assembly Of Mattress Support; Mounting Of The Pipe Pin Between Shear Arm And Base - Invacare ScanBeta NG Manuel D'utilisation

Masquer les pouces Voir aussi pour ScanBeta NG:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

5. Assembling and disassembling the cot

There must be at least two persons to assemble / disassemble the mattress support.
Be careful not to get fingers caught when assembling the cot.

5.1 Assembly of mattress support

1.
Lift the mattress support up over the base.
2.
Carefully lower the mattress support so that the gliding shoes slide
into the gliding rail on both sides of the base.
3.
Carefully lower the foot end, so that the axle ends drop into the
spring lock.
4.
Lock the spring lock by pulling the red button out and turning it 45°
anti-clockwise until it locks.
5.
The motors may need to be mounted once again. (see section 5.3)
6.
Please ensure that the cot is properly assembled and that both spring
locks are in place and locked.

5.2 Mounting of the pipe pin between shear arm and base

1.
The pipe pin must be mounted with the opening upwards and locked.
2.
Make sure that the pipe pins are fully inserted through both holes of
the tubular section, and that the spring clip is fully engaged onto the
bed end of the pin prior to operating the lifting mechnism on the bed.
3.
Check that all four plastic bushings are intact and located correctly
between shear arm/base and shear arm/top frame.
Do not pull the clamp part of the pipe pin during disman-
tling – the clamp may be deformed, thus being unable to lock
properly.
UM_1542073_UK_DA_ver01.indd 20
20
0
45
2011-10-18 10:02:45

Publicité

Table des Matières
loading

Table des Matières