Secondary drainage
Secondary drainage can be provided by drilling holes (Ø 5mm)
all round the edge above the sealing membrane.
Tiling
NOTICE! We recommend a slope of 2%.
1%
2%
After setting and drying of the screed, the sealing fleece can
be unfolded and the moisture seal can be provided.
Information on sealants and adhesives can be found in the in-
formation sheet on "Composite sealing" issued by the profes-
sional association of the German tile industry within the Ger-
man Construction Confederation (ZDB).
Before tiling, the protective cover (plastic) must be removed
and the decorative rails, channel and grating must be installed.
Differences in height between individual tiles can be offset by
adjusting the plastic screws under the lid element.
Notice! Do not seal the inner side of the gap that runs around
the edge.
2%
2%
2%
1%
MAINTENANCE
WARNING!
Before carrying out any work, always disconnect the Plancofix
from the power supply and ensure that it cannot be switched
on again by other persons.
The system is largely maintenance-free. However, the interior
of the container should be cleaned of adhesions and deposits
on a monthly basis. To do so, simply lift the cover off and then
clean the inside carefully with a paintbrush.
The float does not have to be dismantled and may only be
pulled up to noticeable resistance!
NOTICE! Do not use aggressive drain cleaners!
If the hydraulic system is blocked, pull the red fixing element
upwards and take it out. Next, gently loosen the hydraulic sys-
tem and remove it. After cleaning, make sure that when you
re-insert it, the swing-type check valve and the two seals are
firmly in place. To facilitate assembly, apply a little lubricant to
the two sealing rings before fitting. Finally, the red fixation is
inserted.
ENGLISH
9