Télécharger Imprimer la page

Pentair PLANCOFIX LINE JP50177 Instructions De Service page 8

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 10
ENGLISH
Conduits must be created for the pressure pipe and electricity
supply cable, 1" FPT pressure pipe outlet, 3/4" cable conduit.
Inserting the tank
NOTICE! The protective covers at the side and the top must be
fitted to the Plancofix.
1. Screw on the four feet.
2. Adjust the feet until the Plancofix is level and is standing in
the recess at the appropriate height.
3. To reduce the transmission of sounds to a minimum, the
protective cover at the side of the tank must remain in
place.
4. Notice! The following materials are approved for the
pressure pipe: PVC (DIN 8062), PE-HD (DIN 8074) and PP
(DIN 8077).
Notice! When the pressure pipe is connected to the pres-
sure outlet, do not seal the connection with hemp but wind
not more than 6 layers of Teflon tape around the outlet.
Acoustically isolate the pressure pipe, connect it to the
pressure outlet with a 1" female thread and route it to the
nearest downpipe.
Notice! Tighten the fitting carefully to avoid damaging the
pressure outlet.
5. If the pressure pipe is laid horizontally, the hand-over point
to the downpipe must lie 25 cm higher than the Plancofix.
In the highest point, the pressure pipe must be extended to
avoid a suction lifter.
8
Functional test
A functional test must be carried out before laying the screed.
Motor noises on starting up are not a cause for concern as they
are normal in synchronous motors.
Fill water in from above through the floor drain and get the
Plancofix to pump out several times. Avoid directing the water
into the suction area of the pump to prevent ventilation prob-
lems. (Please do not hold the hand shower directly into the col-
lection space). The full water capacity must be pumped!
Also check for leaks in the inlet and pressure pipe. Later
changes can only be made with a considerable effort.
Laying the screed
NOTICE! Prior to filling, fold the sealing fleece upwards and
place a weight on it.
Plancofix must be weighted to ensure proper positioning du-
ring filling.
The entire area can now be filled with screed.
After the screed has set, the enclosed square seal is bonded to
the integrated sealing strip. After the customer has attached a
further thin-bed waterproofing system, the area can be tiled.

Publicité

loading