COMBUSTION HEAD
ASSEMBLY
To put in place insulation fl ange 2,
which must be positioned between
the burner and the plate of boiler
1, the end of the combustion head
must fi rst be removed.
a) Adjust position of connector fl an-
ge 4 by loosening screws 6 so
that the combustion head pene-
trates into the combustion cham-
ber the amount recommended by
the generator's manufacturer.
b) Position seal insulation 3 on the
tube unit.
c) Fasten the combustion head as-
sembly to the boiler 1 using the
stud bolts, washers and the nuts
provided 5.
d) With suitable material, comple-
tely seal the space between
the tube unit of the burner and
the hole on the refractory plate
inside the boiler door.
APPLICATION OF THE BURNER TO BOILER
0006081117_2006/09
32 / 75