Télécharger Imprimer la page

SEA SATURN 600 24V Mode D'emploi page 7

Masquer les pouces Voir aussi pour SATURN 600 24V:

Publicité

Sistemi Elettronici
di Apertura Porte e Cancelli
International registered trademark n. 804888
11. RISK EXAMINATION
The points pointed by arrows in Fig. 22 are potentially
dangerous. The installer must take a thorough risk examination
to prevent crushing, conveying, cutting, grappling, trapping so
as to guarantee a safe installation for people, things and animals
(
Re. Laws in force in the country where the installation has been
made.
)
12. NOTICE
SEA can not be deemed responsible for any damage or accident
caused by product breaking, being damages or accidents due to
a failure to comply with the instructions herein. The guarantee
will be void and the manufacturer responsibility (according to
Machine Law) will be nullified if SEA original spare parts are not
being used.
The electrical installation shall be carried out by a professional
technician who will release documentation as requested by the
laws in force.
This is a quotation from the GENERAL
DIRECTIONS that the installer must read carefully before
installing. Packaging materials such as plastic bags, foam
polystyrene, nails etc must be kept out of children's reach as
dangers may arise.
13.
SAFETY PRECAUTIONS:
All electrical work and the choice of the operating logic should
conform to current regulations. A 16 A 0,030 A differential
switch must be incorporated into the source of the operators
main electrical supply and the entire system properly earth
bonded. Always run mains carrying cables in separate ducts to
low voltage control cables to prevent mains interference.
14.
SPARE PARTS:
To obtain spare parts contact:
SEA S.p.A. -Zona Ind.le, 64020 S. ATTO Teramo Italia
14
cod. 67410324
®
Fig. 22
1 5 . S A F E T Y A N D E N V I R O N M E N TA L
COMPATIBILITY:
Don't waste product packing materials and/or circuits.
When being transported this product must be properly
packaged and handled with care.
SEA reserves the right to do changes or variations that may be
necessary to its products with no obligation to notice.
16. PERIODIC MAINTENANCE
Check the oil level (where present)
(Use the oil level rod)
Change oil
Check the release functionality
Check the clutch functionality
(where present)
Check the distance between pinion and gear
rack (1.5 mm)
Check the usury status of pinion and
gear rack
Check the fixing screws
Check the connection cables integrity
Check limit switch functionality and status in
opening and closing and the related
small plates
All the above described operations must be done exclusively by
an authorized installer.
REV 05 - 07/2014
ENGLISH
Annual
4 years
Annual
Annual
Annual
Annual
Annual
Annual
Annual

Publicité

loading

Ce manuel est également adapté pour:

Saturn 1000Saturn 2000Saturn 600Saturn 1400 24vBoxer 1000Boxer 2000 ... Afficher tout