Power Supply Line - baltur TBG 50LX ME Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

WORKING FIELD TGB 50LX ME ÷ 200LX ME
E
N
G
L
The working fields are obtained from test boilers corresponding to the standard EN676 and are indicatively for the combination burner-boiler.
For correct working of the burner the size of the combustion chamber must correspond to current regulations; if not the manufacturers must be consulted.
I
S
H

POWER SUPPLY LINE

GENERAL GAS BURNER SYSTEM
The gas supply scheme is shown in the diagram below. The gas train is certified in accordance with regulations EN 676 and is suplied
separately from the burner.
A manual shut off valve and anti-vibration joint must be installed upstream of the gas valve, as shown in the diagram.
Legend
1) Manual shut off valve
2) Anti-vibration joint
3)
Gas filter
4) Minimum gas pressure switch
5) Safety valve
6) Pressure regulator
7) Valves seal control device
8) Working valve
Gas train
supplied by the manufacturer
9) Air adjustment servo motor
1 0) Air adjustment gate
11) Air pressure switch
12) Combustion head
13) Gas adjustment throttle
14) Gas adjustment servo motor
22 / 66
000608328_20072
N° 0002922511
REV.: 13/11/07
N° 0002910950
REV.: 10/05/06
The job of the installer

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Tbg 80lx meTbg 110lx meTbg 140lx meTbg 200lx me

Table des Matières