4.1.1 HORIZONTAL SHIELDING
TERMINALS MUST NOT BE RECESSED INTO A WALL OR SIDING MORE THAN THE DEPTH OF THE
This application occurs when venting through an exterior wall.
Having determined the correct height for the air terminal
location, cut and frame a hole in the exterior wall as
illustrated to accommodate the fi restop assembly.
Dry fi t the fi restop assembly before proceeding to
ensure the brackets on the rear surface fi t to the
inside surface of the horizontal framing.
The length of the vent shield may be cut shorter
for combustible walls that are less than 8 1/2"
(215.9mm) thick but the vent shield must extend the
full depth of the combustible wall.
Apply a bead of caulking (not supplied) around the corner edge of
A.
the inside surface of the fi restop assembly, fi t the fi restop assembly
to the hole and secure using the 4 screws (supplied in your manual
baggie).
Once the vent pipe is installed in its fi nal position, apply high
B.
temperature sealant W573-0007 (not supplied) between the
pipe and the fi restop.
NOTE: The framing dimension may be reduced to a 9 1/2" (241mm) square opening if the vent length,
from the appliance to the framed hole, is 24" (610mm) or greater. If not, it is recommended to use a
terminal extension plate, W500-0103, when mounting the air terminal.
4.1.2 VERTICAL SHIELDING
This application occurs when venting through a roof. Installation kits for
various roof pitches are available from your authorized dealer / distributor.
See accessories to order specifi c kits required.
A. Determine the air terminal location, cut and frame a square opening as
illustrated in the ceiling and the roof to provide the minimum 1" (25mm)
clearance between the vent pipe and any combustible material. Try to center
the vent pipe location midway between two joists to prevent having to cut
them. Use a plumb bob to line up the center of the openings. A vent pipe
shield will prevent any materials such as insulation, from fi lling up the 1"
(25mm) air space around the pipe. Nail headers between the joist for
extra support.
B. Apply a bead of caulking (not supplied) to the framework or to the Wolf
Steel vent pipe shield plate or equivalent (in the case of a fi nished ceiling),
and secure over the opening in the ceiling. A fi restop must be placed on the
bottom of each framed opening in a roof or ceiling that the venting system passes
through. Apply a bead of caulking all around and place a fi restop spacer over
the vent shield to restrict cold air from being drawn into the room or around the
fi replace. Ensure that both spacer and shield maintain the required clearance to
combustibles. Once the vent pipe is installed in its fi nal position, apply sealant between the
pipe and the fi restop assembly.
C. In the attic, slide the vent pipe collar down to cover up the open end of the shield and
tighten. This will prevent any materials, such as insulation, from fi lling up the 1" (25mm) air
space around the pipe.
All manuals and user guides at all-guides.com
WARNING
!
RETURN FLANGE OF THE MOUNTING PLATE.
CAULKING
FIRESTOP
SPACER
FINISHING
MATERIAL
19
DETERMINE
THE
CORRECT
HEIGHT
20.6A
FIRESTOP
UNDERSIDE OF
JOIST
CAULKING
VENT PIPE
SHIELD
VENT
PIPE
COLLAR
VENT
PIPE
SHIELD
21.1