System variant
• Select the relevant system variant and confirm with OK, the menu item
Power quantity
Select the relevant power quantity and confirm with OK, the menu item
Maintenance interval
• Select the required maintenance period or enter accordingly and confirm with OK, the menu item
appears, initialisation is complete.
4.8.2 Functional check
Follow the safety instructions in chapter 3.
• Switch off the pumping station (if necessary, disconnect the mains power plug)
• If necessary, Open the cover of the system tank (inspection chamber)
• Fill the system tank with water until the switching level of the system is exceeded
• Switch on the pumping station (if necessary, plug in the mains plug)
– If installed, check whether the control unit is initialised
– Pump starts up automatically
– The pump pumps out water until the switching-off level is reached (pump head visible once again)
– Pump switches off automatically
• Check the control unit for errors/alarm signals. In the event of errors/alarm signals, contact KESSEL
Customer Services
2018/07
All manuals and user guides at all-guides.com
Installation
53 / 208
Power quantity
appears.
Maintenance date
appears.
System info
010-992