 Cei : MS intensive cooling inlet connection GM : G3/8''  
 Csi : MS intensive cooling outlet connection GM : G3/8''  
 Rh : oil filling port : 20 
 Vh : oil drain connection : G1/4'' 
 Nh : oil level control : G3/4'' 
 H : constant level oiler : G1/4'' 
 
7.3 ELECTRICAL CONNECTION / EARTHING 
Check  that  motor  winding  corresponds  to  site  electric  power 
 
supply characteristics before electrical connections are performed. 
Connecting  a  230/400V  motor  on  a  400V  power  supply  or 
 
connection  of  a  400/690V  motor  on  a  690V  power  supply  might 
drive  to  motor  destruction  if  terminal  strip  are  positioned  in  a  wrong 
way. 
 
Electrical connection should be performed by qualified personnel 
 
only  having  necessary  agreements  and  in  compliance  with  local, 
national and international regulations. 
 
Equipments used in an ATEX zone will be connected in compliance 
 
with CEI60079‐14. It is the responsibility of the end user to select 
proper type and size of electric cable. 
 
Respect  motor  manufacturer  instructions  to  make  electric  motor 
 
connection (refer to the instructions supplied with the motor. they 
are  usually  indicated  inside  motor  junction  box).  Sensors  will  be 
connected  in  compliance  with  the  instructions  given  in  dedicated 
instruction manual. 
 
7.3.1
TERMINAL  STRIP  POSITIONNING  FOR  STAR  
(Y)  AND  DELTA  () CONNECTION  (MULTI‐
VOLTAGES ELECTRIC MOTORS) 
Multi‐voltage winding for voltages  230/400V and 400/690V :  
 
6 wiring terminals : 
To  change  motor  direction  of  rotation  reverse  two  phases  on  wiring 
terminals. Connection of earthing terminal is mandatory. 
 
7.3.2
LOWER VOLTAGE :  CONNECTION 
Voltage : U 
 
 
 
7.3.3
HIGHER VOLTAGE : Y CONNECTION 
Voltage : U3 
 
7.3.4
Y /  STARTER : 
 
Grounding  of  the  complete  pumpset  will  be  performed  with 
special  care.  Earthing  will  avoid  any  electrostatic  accumulation  in 
components  of  the  pumpset.  Each  part  of  the  pumpset  should  be 
connected  to  earth  with  a  correctly  calibrated  bonding  strap  or  cable 
(motor winding, motor frame, coupling guard, pump baseframe). 
 
7.4 USE OF A FREQUENCY INVERTER 
When  pump  is  used  with  a  variable  speed  drive,  make  sure  that 
the  frequency  inverter  instructions  and  operating  manual  is 
available and known. 
 
The  electric  motor  that  is  supplied  with  the  pump  may  be  connected 
under  conditions  to  a  VSD.  Variable  speed  will  be  used  to  reach  pump 
required duty point on site. To ensure a reliable use of the equipment a 
few precautions should be taken : 
 
Electrical requirements : 
  Variable  frequency  drive  will  not  generate  voltage  peak  higher  than 
850V  (motor phases isolation) and dU/dt values higher than 2500 V/µs 
(winding  isolation).  If  those  values  can  be  reached,  a  filter  should  be 
installed  :  ask  inverter  manufacturer  for  proper  selection  and  motor 
manufacturer for limit values. 
  Choose  a  vector  control  inverter  or  use  a  quadratic  V/F  control 
inverter. 
 Check that motor nominal voltage is never exceeded. 
Power supply cable should comply to ATEX regulation. Ensure that 
motor winding is equipped with CTP temperature sensors inside. 
A  physical  barrier  should  separate  power  supply  cables  and  low 
voltage cables to avoid analog signal distortion. 
 
Hydraulic requirements : 
 A dedicated suction pipe should be dedicated to each pump used with 
a negative suction head (suction lift). 
  Check  that  the  pump  NPSH
system NPSH
 . 
A
 
Mechanical requirements : 
  Lower  speed  should  not  fall  under  40%  of  pump  nominal  speed  to 
avoid any vibrations and an unstable flow. 
13 
  ENGLISH  
 
 
  at  minimum  speed  is  always  lower  than 
R
 

Publicité