Warm-Up; Calibration - Siemens Scio Manuel De Référence

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

X2 connector
3. Connect one end of the monitor/module intermediate cable to
the X2 connector at the rear of the module and the other end
to the CPS/IDS connector marked X12 . If you are using a
breakout box, connect the end to the connector on the break-
out box.
4. Connect the power supply to the external power supply con-
nector at the rear of the module.
5. Connect the power supply cord to a hospital-grade outlet.

Warm-Up

Upon start-up, the Scio module passes through an initialization
and warm-up period. During this time, the etCO
Agent parameter boxes display a question mark (?) and the moni-
tor does not transmit Scio data over the network, nor is this data
trended.
WA RN IN G : During warm-up, reported values might not
be accurate. To achieve full accuracy, a typical warm-up
period of 5 minutes is recommended. Refer to the Tech-
nical Data appendix for a detailed description of Scio
accuracy.

Calibration

The Scio module is self-zeroing and does not need calibration by
the clinical staff.
Page 6
Scio MODULE D011100
Exhaust port
External Power
Supply connector
*, O
, and/or
2
2
SC 7/8/9XL VF2.x

Publicité

Table des Matières
loading

Table des Matières