Télécharger Imprimer la page

KONG Italy Q.R.K. Mode D'emploi page 16

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 75
3.3 INSPECTION PRIOR TO MISSION - I.P.M.
The operator must do this inspection
before each mission, in the manner laid
down in points a) and b) of paragraph 3.2.
PLEASE NOTE
Kits found to be incomplete, must be
taken out and sent for an O.I.
3.4 ORDINARY INSPECTION - O.I.
An Ordinary Inspection must be carried out:
-
Within 12 months of the date of first
use.
-
If the I.P.D. and I.P.M. are not passed.
Q.R.K.s for which these conditions apply,
must be handed over by the personnel
to whom they have been assigned to the
personnel authorised to service them by
the Manufacturer.
NOTE:
Q.R.K.s in stock do not have to undergo an O.I. even if 6 months have passed since the
date of purchase. Before assigning them to a user for operational use, they must undergo
an O.I. if 6 months have passed since the dates indicated above.
16
NOTE:
The I.P.M. must not be recorded in the
identity handbook.
PLEASE NOTE
If any damage occurs to structural
parts of any component in the
Q.R.K., repairs must not be done
by the department, but by the
Manufacturer, and so the device
must be returned to them for repairs.

Publicité

loading

Produits Connexes pour KONG Italy Q.R.K.

Ce manuel est également adapté pour:

Quick release kong881.01881.02881.03