Emerson Appleton Mercmaster Connect Instructions D'installation page 12

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Wall (kPWb-75, kPWb-100)
Dimensions:
Installation:
1. Bolt the wall hood to a structural member.
2. Remove unused conduit plugs and reinstall with a corrosion-inhibiting grease, such as petroleum or soap-thickened mineral oils, in
3 lines, spaced approximately 120 degrees apart, perpendicular to the threads on the conduit plugs.
3. Tighten the screw inside the hood to a torque of 1.9 Nm min. 2.6 Nm max.
Appleton • 1.800.621.1506 • www.appletonelec.com
LUMINAIRE WITh SMALL hEAT SINk
LUMINAIRE WITh LARGE hEAT SINk
fIGURE 13: LUMINAIRE WITh WALL hOOD
Wall (KPWB-75, KPWB-100)
Mounting:
1. Bolt the wall hood to a structural member.
2. Remove unused conduit plugs and reinstall with tlc-3 grease applied in approximately three equal
the conduit plugs.
CONDUIT ENTRY (5x)
fIGURE 14: WALL hOOD DETAILS
25° Stanchion (KPS-125, KPS-150)
Mounting:
1. Apply tlc-3 grease in approximately three equal lines, spaced equally apart on the conduit stem. t
the 1-1/4 inch or 1-1/2 inch conduit stem. NOTE: five full threads must be engaged.
2. determine the orientation and tighten the set screw.
DOC000084A000 Rev. 03 MY8382 • 03-AUG-22 • Page 12 of 46

Publicité

Table des Matières
loading

Table des Matières