Emerson Appleton Mercmaster Connect Instructions D'installation page 10

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Ceiling (kPC-75, kPC-100)
Dimensions:
Installation:
1. Bolt the ceiling hood directly to a structural member; thread onto a 3/4 inch or 1 inch conduit stem; or bolt to a flush mounted
junction box (see NOTES).
2. Remove unused conduit plugs and reinstall with a corrosion-inhibiting grease, such as petroleum or soap-thickened mineral oils,
in 3 lines, spaced approximately 120 degrees apart, perpendicular to the threads on the conduit plugs.
3. Tighten the set screw inside the hood to a torque of 1.9 Nm min. 2.6 Nm max.
NOTES:
• Four drill marks on the 3-1/2 inch pitch diameter are provided for junction box mounting.
• Install the junction box gasket (supplied) between the junction box and the ceiling hood.
Appleton • 1.800.621.1506 • www.appletonelec.com
Pendant (KPA-75, KPA-100, KPAF-75, KPAF-100)
Mounting:
1. Apply tlc-3 grease in approximately three equal lines, spaced equally apart on the cond
the 3/4 inch or 1 inch conduit stem.
2. tighten the set screw inside the hood.
JCT BOX
CONDUIT
STEM
SET SCREW
(INSIDE HOOD)
Pendant Cone (KPCH-75, KPCH-100)
Mounting:
LUMINAIRE WITh SMALL hEAT SINk
1. Apply tlc-3 grease in approximately three equal lines, spaced equally apart on the cond
onto the 3/4 inch or 1 inch conduit stem.
2. tighten the set screw.
SET SCREW
LUMINAIRE WITh LARGE hEAT SINk
fIGURE 9: LUMINAIRE WITh CEILING hOOD
Ceiling (KPC-75, KPC-100)
Mounting:
1. Bolt the ceiling hood directly to a structural member; thread onto a 3/4 inch or 1 inch con
junction box (see notEs).
2. Remove unused conduit plugs and reinstall with tlc-3 grease applied in approximately t
the conduit plugs.
CONDUIT ENTRIES (5x)
NOTES:
fIGURE 10: CEILING hOOD DETAILS
• four drill marks on the 3-1/2 inch pitch diameter are provided for junction box mounting.
• install the junction box gasket (supplied) between the junction box and the ceiling hood.
DOC000084A000 Rev. 03 MY8382 • 03-AUG-22 • Page 10 of 46
Appleton • 1.800.621.1506 • www.appletonelec.com
CEILING
PENDANT HOOD
CONDUIT STEM

Publicité

Table des Matières
loading

Table des Matières