RouterNode 2, GatewayNode 2,
SmartBridge
Wiring to
device
EN
6. Slide the base plate so that the screw heads slide
along the grooves.
7. Place the cover on the base plate again.
9
Installation completed.
You can install the cables both on (surface-mounted)
and under (flush-mounted) plaster.
If you install the cables under the plaster, then use
the opening integrated in the base plate.
If you lay the cables on the plaster, then you must
modify the housing.
Power supply disconnected.
ü
5. Installation
39 / 176