5. Installation
Version 1: Left-hand opening
38 / 176
2. Hold the base plate in the required position and
mark the drill holes.
3. Drill the required holes with a suitable drill.
4. Use suitable dowels and fasten the screws for the
base plate into position.
5. Place the base plate so that the screw heads are
fed through the recesses.
RouterNode 2, GatewayNode 2,
Version 2: Right-hand opening
Base
SmartBridge
EN