Operation; Refilling The Regenerative; Actuating Manual Regeneration - BWT Rondomat Duo-DVGW 2 Instructions De Montage Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

EN
The fill level should never
fall below this mark.
NaCL
NaCL
NaCL
00 : 17 : 35
42
Note:
H
O
2
NaCL
H
O
2
NaCL

8 Operation

8.1 Refilling the regenerative

Important: The amount of regenerative should never fall below the mi-
nimum level.
At the latest, regenerative must added when the minimum level in the
regenerative container is reached.
All commercially available regenerative salts conforming to EN 973 can
be used (in loose or tablet form).
Unscrew the lid (7) of the salt/brine container and remove. Pour in the
regenerative (always adding whole units) up to a maximum of 75 / 150
kg. Close the lid.
Drain excess brine off through the overflow.

7.4 Actuating manual regeneration

Press the Browse button
Set the cursor to Manual
Press OK.
Set the cursor to Regeneration
Press OK to confirm.
The unit is regenerating.
Press the Browse button twice
Each stage of the regeneration process is displayed with the progres-
sing time.
The regeneration process lasts between 28 and 52 minutes depen-
ding on the unit.

Publicité

Table des Matières
loading

Table des Matières