Valor 563SCB Guide De L'installation Et Du Consommateur page 7

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

b) Fit the rear base support under the rear of the
appliance attaching it to the appliance back
panel with 2 x 3/8" thread cutting (pointed end)
screws.
c) Fit the front plinth under the appliance front
with 2 thread forming screws.
5. Install top insulation layer. For top vent outlet
appliances, cut out a circle at the center of the
insulation layer for the vent collar. Place the
insulation layer on top of the appliance case
inboard of the stand-off spacers.
! Warning: Failure to install the insulation layer
may cause a fi re hazard and voids warranty.
4"
(102 mm)
total
insulation
Pull forward to expose
minimum width of 5"
Cut out insulation
for top vent installation
6. If the hooks have been
shipped loose with the
cast front, fi x them to the
front at its top corners.
7. Hook the cast
front on the
appliance
through slots on
each side of the
heat duct.
8. Place the cast top on the cast front.
9. Hook the ashpan door to the bottom of the cast front
under the fret.
10. Install the barrier screen. Insert the top clips at the top
of the decorative cast panel. Push the bottom against
the cast front so the clips snap into place.
top
bottom
front view
space between
the edge of screen
and hook is smaller
at the top than at
the bottom (top and
bottom hooks are
also different)
7

Publicité

Table des Matières
loading

Table des Matières