Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 37
Proceed as follows:
• Connect one lead to the heater braid.
• Connect the other lead to both heater
conductors together.
• Apply voltage. The resistance reading must be
greater than 100 MΩ.
• If the insulation resistance is less than this,
the heater may be damaged. Where possible,
locate the fault and rectify. Record the
insulation resistance value on the Installation
Test Record.

FINISHING

Complete Sensor
Complete the installation of the sensor (where
necessary).
Install Panel and Controls
Install the electrical panels according to the
manufacturer's instructions.
Install control units, thermostats and manual
control equipment in accordance with the
manufacturers' instructions.
Conductors
Braid
Finishing
Install a grid over the drain to ensure that the heat
strip is protected from damage.
Note: A 30 mA residual current device (rcd)
is required for the drain tracing. Ensure that
there are no more than 60 m of heating
cable connected to each 30 mA rcd.
2500 Vdc Insulation resistance tester
Complete Wiring and System
Follow applicable local regulations.
nVent.com | 19

Publicité

Table des Matières
loading

Table des Matières