Installing The Thermometer; Assembling The Side Shelf; Mounting The Shelves To The Grill - Pit Boss PB700R2 Assemblage Et Fonctionnement

Masquer les pouces Voir aussi pour PB700R2:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6. INSTALLING THE THERMOMETER

Parts Required:
1
x
Thermometer (#6)
Installation:
Remove the pre-installed nut from the thermometer. Insert the
thermometer into the hole provided on the top of the lid of the main
barrel, then secure by re-installing the nut from the inside. Rotate the
thermometer so the text is level and upright.

7. ASSEMBLING THE SIDE SHELF

Parts Required:
1
x
Side Shelf (#18)
2
x
Side Shelf Supports (#10)
1
x
Corner Shelf (#19)
7
x
Screw (#A)
7
x
Locking Washer (#B)
7
x
Washer (#C)
Installation:
Turn the side shelf upside down. Install the side shelf supports onto the
side shelf using four washers, locking washers, and screws. Note 7A.
Next, assemble the corner shelf onto the side shelf using three washers,
locking washers and screws. Note illustration 7B.

8. MOUNTING THE SHELVES TO THE GRILL

Parts Required:
Front Shelf (#20)
1
x
Screw (#A)
11
x
11
x
Locking Washer (#B)
11
x
Washer (#C)
Installation:
NOTE: Do not tighten any screws completely until all screws have
been installed. Once all screws are installed, then tighten securely.
First, mount the front shelf onto the front shelf supports using four
washers, locking washers, and screws. Note illustration 8A.
Next, mount the corner and side shelf onto the front shelf and grill
barrel end using seven washers, locking washers, and screws. Note
illustration 8B for guidance.
IMPORTANT: Avoid using shelves to move or lift the grill. The weight
of the unit will cause the shelves to break, which is not covered by
warranty.
6
6
7A
10
10-2
A B C
16
7B
18
8A
20
8B
19
10
10-1
19
18
9

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

1053910681

Table des Matières