5-41
5-42
5-43
5-44
78
All manuals and user guides at all-guides.com
Operation
Fig. 5-41 OPTIMISATION "OP.6"
(second measuring run of tyre/rim assembly)
—
—
—
26
The OPTIMISATION "OP.7" screen (Fig. 5-43) may
be displayed.
Alternatively, the reading H1 may appear
If H 1
not recommended. In this case the measured data
does not exceed the limit for recommendation of
the optimisation program. However, it is possible to
continue optimisation so as to improve wheel running
conditions even below the limit value (critical vehicle).
To continue optimisation:
—
To abort optimisation:
—
Fig. 5-43 OPTIMISATION "OP.7"
26
—
—
The OPTIMISATION "OP.8" screen (Fig. 5-44) is
displayed.
Fig. 5-44 OPTIMISATION "OP.8"
(3rd measuring run of tyre/rim assembly)
—
—
26
—
Rotate the wheel into marking position following
the arrows.
In this position mark the tyre, on the outer side of
the wheel, precisely above the main shaft.
Confi rm by pressing the key 26.
(Fig. 5-42)
is read out further optimisation is
Continue as shown on screen OPTIMISATION
"OP.7" (Fig. 5-43).
Press the STOP key to return to the balancing
program and balance the wheel according to the
F
readings
5.8.
On the tyre changer, turn the tyre relative to the
rim such until the valve is aligned with the mark
made on the tyre.
Confi rm by pressing the key 26.
Clamp the wheel on the balancer.
Rotate the wheel such that the valve is exactly
perpendicular to and above the main shaft.
Enter the valve position by pressing the key 26.