Snap-On EEWB334A Manuel Opérateur page 76

Masquer les pouces Voir aussi pour EEWB334A:
Table des Matières

Publicité

5-36
5-37
5-38
5-39
5-40
76
All manuals and user guides at all-guides.com
Operation
Fig. 5-36 OPTIMISATION "OP.2"
START is signalled on the screen.
A compensation run is performed.
The screen "OP.3" as shown in Fig. 5-37 is displayed.
Fig. 5-37 OPTIMISATION "OP.3"
26
The OPTIMISATION "OP.4" screen (Fig. 5-38) is
Fig. 5-38 OPTIMISATION "OP.4"
(fi rst measuring run of tyre/rim assembly)
26
The OPTIMISATION "OP.5" screen (Fig. 5-39) is
displayed.
Fig. 5-39 OPTIMISATION "OP.5"
START is signalled on the screen.
A measuring run is performed.
The OPTIMISATION "OP.6" screen (Fig. 5-40) is
displayed.
Spinn the wheel.
Mount the tyre correctly on the rim and infl ate
to specifi ed infl ation pressure (make sure the
mounting guide rim of the tyre is correctly seated).
Confi rm by pressing menu key 26.
displayed.
Clamp the wheel on the balancer.
Readjust the wheel such that the valve is exactly
perpendicular to and above the main shaft.
Enter the valve position by pressing menu key 26.
Perform the measuring run.

Publicité

Table des Matières
loading

Table des Matières