2.15 Pebble Arrangement: Propane

1 Procedure: First place the Mat on top of the Burner and place the grate plate on top of the
Mat and Burner.
Place 3 pebbles across the rear of the Firebox, with an additional pebble at the two extre-
mities of the burner (Fig. 22).
Place 2 pebbles, longitudinally along the centre of the burner (Fig. 23).
Place 4 pebbles around the front of the grate (Fig. 24).
Place 2 pebbles on top of the very back 2 pebbles, so that they are touching the back of the
Firebox, a further 2 pebbles are placed between the end pebble and the corner pebble, one
at each end (Fig. 25).
5 more pebbles are then placed between the front to rows in place (Fig. 26).
Place 2 pebbles behind the central row of pebbles, located in between the 3 pebbles at the
rear of the arrangement. Position another 3 pebbles at the very rear of the fi rebox, on top of
the rear row (Fig. 29).
The last pebble will now sit in the middle of the arrangement, on top of the 2 pebbles placed
on top of the burner in the last stage (Fig. 30).
Ensure that the Pilot fl ame is still visible.
The arrangement is now complete.
24
25
23
21
22
Fig. 29
All manuals and user guides at all-guides.com
26
Fig. 30

2.16 Gravel Arrangement - Natural

1 bag of Gravel
Procedure: First place the Mat on top of the
Burner and place the grate plate on top of the Mat
and Burner.
Scatter the contents on the Bag of Gravels over
the top of the Mat and Grate area.
Care is needed so that none of the Gravels enter
the Pilot shield, this area must be kept clear and the cross lighting to the main burner not
impinged (Abb. 38).

2.17 Gravel Arrangement - Propane

1 bag of Gravel
Procedure: First place the Mat on top of the
Burner and place the grate plate on top of the Mat
and Burner.
Scatter the contents on the Bag of Gravels over
the top of the Mat and Grate area, leaving the
Gas ports clear.
Care is needed so that none of the Gravels enter the Pilot shield, this area must be kept clear
and the cross lighting to the main burner not impinged (Abb. 39).

2.18 Initial Operation

A soundness test MUST be made before the installed stove is left with the customer.
Ensure that the fi re is burning at full rate for a minimum of 5 minutes to warm the fl ue.
If there are problems, the chimney/fl ue may require attention. Isolate the stove and seek
expert advice.
The stove will produce an odour and/or smoke for the fi rst few hours of use. Please ventilate
the room.
Fig. 31
Fig. 32
6

Publicité

Table des Matières
loading

Table des Matières