Pressure Testing; Arranging The Ceramic Fire; Opening The Fire Box Door - HASE Luno Gas Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

b
Fig. 10
Attach mounting bracket (a) to spacer plate (b) using disk (e) and screw (d) (Fig. 11).
Move stove into proper position. Fasten mounting bracket (a) to wall using dowel (g) and
screw (f) (Fig. 11).
Distance from back wall of stove to the wall (Fixation to wall) :
2.9

Pressure Testing

The gas pressure to the burner must be measured; this should be measured with all gas
appliances after the gas meter operating on full, including this stove.

2.10 Arranging The Ceramic Fire

Only the ceramics supplied with this appliance are to be used. The ceramics must be laid only
as shown on the following pages. Replacement parts including mat are available from your
dealer, but should only be installed by a qualifi ed installation engineer.
66
All manuals and user guides at all-guides.com
b
a
c
d
Fig. 11
20 - 30,5 cm

2.11 Opening the Fire Box Door

Loosen the hexagonal socket screws at the top and bottom (a, b) of the fi re box door. The
door opens to the left side (Fig. 12, 13).
To close and lock the fi re box door again, position the supplied lever (c) as shown in Figure
21. Push the fi re box door closed, insert the upper hexagonal socket screw (a) and tighten it.
Then tighten the hexagonal socket screw at the bottom (b) (Fig. 15).
c
Fig. 12
c
Fig. 14
a
Fig. 13
a
Fig. 15
b

Publicité

Table des Matières
loading

Table des Matières