WARNING:
Child should be removed from the
product prior to installation, set
up and before adjusting changing
station to the in use position.
IMPORTANT NOTE: Review the
Changing Station on pages i-1.
2
Changing Station
Assembly
Over view: Parts will be assembled
as shown. See Figure 7 to identify
parts.
Slide two changer frames
fabric pockets with the lever on the
side shown (Figure 7a). Connect
frames together at front center opening
until pin clicks (Figure 7b). Then,
position the lever through opening at
front center of fabric (Figures 7a, 7c)
and the connectors through slot in
each side (Figure 7c).
Position cross tube
B
facing down. Slide cross tube inside
fabric pocket and connect pin at each
side (Figure 7d).
Position changer pivots
in Figure 7e) into connectors at sides
of changer and press pivots into
connectors until pins click.
NOTE: Match pivot A with connector
A and pivot B with connector B.
NOTE: Changer can be attached to
either long side of play yard.
All manuals and user guides at all-guides.com
C
into
A
with pins
(as shown
C
Assembly
4
E
A
Lever
B
D
Clips
7b
Lever
Connectors
7c
Play Yard
parc
Front opening
Side slots
A
Changer frames (one with
lever)
C
B
Changer cross tube
C
Changer pivots (2)
D
Changer clamp arms (2)
E
Changer fabric
7
Front opening
Lever
7a
7d
7e