Ac Parallel Operation - Honda EU70is Manuel De L'utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

OPERATION

AC PARALLEL OPERATION

Before connecting an appliance to either generator, make sure that the
appliance is in good working order and that its electrical rating does not
exceed that of the receptacle.
Most motorized appliances require more than their electrical rating for
startup. When an electric motor is started, the OVERLOAD ALARM
indicator (red) may come ON. This is normal if the OVERLOAD ALARM
indicator (red) goes OFF within 5 seconds. If the OVERLOAD ALARM
indicator (red) stays ON, consult your servicing dealer.
During parallel operation, the Eco-Throttle switch should be in the same
position on both generators.
1.Connect the parallel operation cable between two EU70is generators
following the instructions supplied with the parallel kit.
2.Start the engine on each generator and make sure each OUTPUT
indicator (green) comes ON.
3.Plug in the appliance following the instructions provided with the 
parallel kit.
4.Turn on the appliance.
42
PARALLEL KIT
(optional equipment)

Publicité

Table des Matières
loading

Table des Matières