System commissioning
Always avoid the pumps running dry (air is drawn in) for longer periods (> 30 seconds). The pumps can become dam-
aged.
Do not activate pumps in manual operation if the system tank is not filled to at least minimum level.
5.1
Open the shut-off valve
The shut-off valve was pushed in for transport.
Always open before putting into service!
5.2
Connect to the mains voltage
Establish mains voltage (400V control units)
Connect the mains cable to the mains power supply.
Move main switch (1) into ON position.
Initialisation starts automatically.
The device checks the electrical components.
Voltage test of the standby batteries.
|3.10. Language|
Menu item
Establish mains voltage (230V control units)
Insert the safety plug into the designated socket.
Move main switch (1) into ON position.
Initialisation starts automatically.
The device checks the electrical components.
Voltage test of the standby batteries.
|3.10. Language|
Menu item
Switch on
Move main switch (1) into ON position. After a successful system test, the display shows
green LED signals readiness.
If the display does not show initialisation (
the set parameters must be checked or reset to the factory settings (
tings, the initialisation of the control unit starts automatically.
Please note that the counter for the maintenance interval is not changed by the reset to the factory settings.
5.3
Setting up the TeleControl modem for fault messages (option)
In Menu item 3.9, it is possible to define which backwater lifting station events are sent to which text message recipient.
32 / 116
is displayed.
is displayed.
|3.10. Language|
Backwater lifting station / Installation and operating instructions
|0 System info|
) the control unit has already been initialised. In this case,
|3.11 Reset|
). After resetting to the factory set-
and the
010-694