Transport; Installation; General Information; Acoustic Emissions - Dimplex WI 120TU Instructions D'installation Et D'utilisation

Masquer les pouces Voir aussi pour WI 120TU:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

English
5

Transport

For the transport by means of a hand truck or boiler trolley,
posi-tion the latter under the front end of the unit below the
transport security device.
For transport on a level surface, the unit can be lifted from the
rear or from the front by means of a lift truck or forklift. In this
case, the transport securing device is not imperative.
CAUTION!
The heat pump must not be tilted more than 45° (in any
direction).
After transportation, the transport fastening in the device is to
be removed from both sides of the base.
X
CAUTION!
Before commissioning, the transport fastening must be
removed.
All panelling can be removed to allow accessing the inside of
the device.
To remove the panelling, open the individual covers by un-
screw-ing the respective turn-lock fasteners and then gently
tilting the covers away from the device. Then lift them up out of
the mount-ings.
EN-4
6

Installation

6.1 General Information

The water-to-water heat pump must be installed in a frost-free,
dry room on an even, smooth and horizontal surface. The entire
base of the frame should lie directly on the floor to ensure an
adequate soundproof seal. If this is not the case, additional
sound insulation measures may be necessary.
The heat pump must be installed so that maintenance work can
be carried out without hindrance. This can be ensured by main-
taining a clearance of approx. 1 m in front of the heat pump.
Neither frost nor temperatures higher than 35 °C must occur in
the installation location at any time of the year.
NOTE
The heat pump is not intended for use over 2000 metres
above sea level.

6.2 Acoustic Emissions

The heat pump operates silently due to efficient sound insula-
tion. Internal insulation measures should be carried out to pre-
vent vibrations from being transmitted to the foundation or to
the heating system.
X
452237.66.68 · FD 0205
WI 120TU
0,5 m
1,0 m
www.glendimplex.de

Publicité

Table des Matières
loading

Table des Matières