4.4
Establishing electrical connections
Fit the CEE plug
Connect the pre-assembled CEE plug to the heavy cur-
rent socket (three-phase current, 400 V).
Ensure required fuse protection (see "Technical data",
page 24).
Switch the switch on the CEE plug on for test purposes.
If the pump starts up, the system is ready for operation.
Connecting the control unit
Select a suitable position for attachment of the control
unit.
Set up connections (pump, solenoid valve(s) if necessary,
mains cable) in accordance with the connection diagram.
Carry out a functional test (see "Functional test").
28 / 116
016-187_02