Cylinder Installation; Preparation; Transportation; Hydraulic Connection - Dimplex WWSP 885S Instructions De Montage Et D'utilisation

Ballon d'eau chaude sanitaire de 800 litres
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3
3

Cylinder installation

3.1 Preparation

The cylinder should only be installed in frost-free areas with
short distances between lines.
A firm, sturdy and flat installation location (substrate) is es-
sential.
Pay attention to the position of the connection openings, es-
pecially on the flange opening when installing the cylinder.
4

Hydraulic connection

4.1 Connection - parallel (use as a pure domestic hot water cylinder)

GB-4

3.2 Transportation

It is important to ensure that the transport route is free of obsta-
cles and trip hazards. The required heights and widths for trans-
porting the cylinder into the building can be inferred from the
technical data. The tilting dimension of the cylinder is to be ob-
served.

Publicité

Table des Matières
loading

Table des Matières