Installation - Sime RMG 70 MK.II Mode D'emploi

Masquer les pouces Voir aussi pour RMG 70 MK.II:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1.4 
MAIN COMPONENTS (fig. 2)
2 

INSTALLATION

The. boiler. must. be. installed. in. a. fixed.
location. and. only. by. specialized. and.
qualified. firms. in. compliance. with. all.
instructions.contained.in.this.manual.
Furthermore,.the.installation.must.be.in.
accordance. with. current. standards. and.
regulations.
2.1 
BOILER ROOM (fig. 3)
The."RMG Mk.II".boilers.with.a.rating.of.
more.than.35.kW.must.be.equipped.with.
a.technical.room.whose.dimensions.and.
requirements.correspond.to.the.current.
safety.standards..
The. minimum. height. of. the. boiler. room.
must. comply. with. what. is. indicated. in.
fig.. 3. in. relation. to. the. overall. thermal.
capacity..
The. minimum. distance. between. the.
walls.of.the.room.and.the.external.points.
of. the. boiler. (right,. left. side,. rear). must.
not.be.less.than.0.60.m..
It. is. possible. to. place. a. number. of.
apparatus.next.to.each.other,.on.condi-
tion.that.all.the.safety.and.control.devi-
ces. can. be. easily. reached.. In. addition,.
to. circulate. air. in. the. room,. air. vents.
must.be.made.on.the.outside.walls.for.
which. the. surface. area. must. never. be.
2
less. than. 3,000. cm
. and. 5,000. cm
gas.with.a.density.greater.than.0.8.
2.1.1 
Handling (fig. 3/a)
Once.the.boiler.is.in.its.place.of.installa-
tion.and.the.packaging.has.been.removed,.
proceed. as. follows. if. it. must. be. moved.
(fig..3/a):
–. remove.the.casing.cover;
KEY
. 1. Gas.valve.with.coil.assembly
. 2. 1/2".bulb.holder
. 3. Safety.stat
. 4. Lock.out.reset.button
. 5. Main.switch
. 6. Regulation.sta.with.double.contact
. 7. Thermometer
. 8. Smoke.stat.
. . ("70 - 80 - 90 100" models)
. 9. 1/8".pressure.test.point.
. . ("110" models)
. 1 0. 1/8".pressure.test.point.
. 1 1. Burner.manifold
–. attach. the. lifting. brackets. (located. on.
the.rear.of.the.boiler).and.fasten.it.in.
2
. for.
place.with.the.screws.provided;
–. insert.two.3/4".pipes.in.the.holes.in.the.
brackets,. lift. the. boiler. carefully. and.
place.into.position.
2.2 
CONNECTING UP SYSTEM
Before. proceeding. to. connect. up. the.
boiler,. you. are. recommended. to. make.
the. water. circulating. in. the. piping. in.
H.in.relation.to.the.overall.
thermal.capacity:
–..not.greater.than.116.kW:.2.00.m
–..greater.than.116.kW.and.less.
. than.350.kW:.2.30.m
–..greater.than.350.kW.and.less.
. 580.kW:.2.60.m
–..greater.than.580.kW:.2.90.m
IT
ES
FR
ENG
Fig..2
Fig..3
43

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Rmg 80 mk.iiRmg 90 mk.iiRmg 100 mk.iiRmg 110 mk.ii

Table des Matières