Sime RMG 70 MK.II Mode D'emploi page 50

Masquer les pouces Voir aussi pour RMG 70 MK.II:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ler.gas.conversion.kit,.pressure.regulator.
(3...20. mbar). with. pressure.
(4...37. mbar). and. apply. the. LPG. adaptor.
code.6248303.onto.the.gas.valve.(5.fig..10).
for."70÷100 Mk.II" models..
To.adjust.the.operating.pressures,.refer.
to.section.4.2..
When the working pressures have been 
adjusted, reseal the regulators.
After. have. ultimated. the. conversion. of.
the. boiler,. please. stick. onto. the. casing.
panel. the. plate. showing. the. relevant.
feeding. gas. which. is. included. into. the.
conversion.kit.
NOTE: After assembling all the gas con-
nections,  a  test  for  gas  tightness  must 
be carried out using soapy water or spe-
cial products. Do not use naked flames. 
The conversion to different gas must be 
carried  out  exclusively  by  authorized 
technical personnel.
4.5 
SHELL DISASSEMBLY (fig. 12)
Follow. the. steps. described. below. to.
disassemble.the.shell.(fig..12):
–. Remove. the. shell. door. (1). which. is.
attached.with.pressure.fit.pins.
50
–. To.remove.the.cover.(3).loosen.the.two.
regulator.
screws. that. attach. it. to. the. flue. gas.
chamber.and.lift.
–. Remove.the.top.front.panel.(2).placing.
it.against.the.flue.gas.chamber.
–. Disassemble. the. left. side. (4).
unscrewing. the. nuts. that. attach. it. to.
the.tie.rods.
–. Do.the.same.operation.to.disassemble.
the.right.side.(5).
–. Remove.the.inner.wall.(6).by.pulling.it.
forward.
–. Unscrew.the.nuts.that.secure.the.rear.
wall.(7).to.remove.it.from.the.tie.rods.
4.6 
CLEANING AND 
MAINTENANCE (fig. 13)
At. the. end. of. each. heating. season,. it. is.
essential. to. have. the. boiler. thoroughly.
checked.and.cleaned.out.
Proceed.as.follows:
–. Turn.the.main.switch.off.to.stop.elec-
tric. power. reaching. the. boiler. and.
close.the.gas.feed.cock.
–. Remove.the.shell.door.and.cover.
–. Remove. the. top. panel. of. the. flue. gas.
chamber.attached.to.it.with.self-thre-
ading.screws.
–. Remove.the.gas.unit.
–. Insert. a. special. brush. from. the. top.
into. the. rows. of. pins. in. the. cast. iron.
exchanger.and.move.the.brush.up.and.
down.to.remove.the.scales.
–. Remove. the. burner. from. the. nozzle.
header. and. aim. a. jet. of. air. toward.
the. inside. of. the. burners. to. remove.
any.dust..Make.sure.that.there.are.no.
scales. on. the. top. drilled. part. of. the.
burners.(fig..13).
–. Remove.any.scales.from.the.bottom.of.
the. boiler. and. replace. the. items. that.
were. removed,. checking. the. position.
of.the.gaskets.
–. Check.the.chimney.to.make.sure.that.
the.flue.is.clean.
–. Check.operation.of.the.equipment.and.
the.main.burner.
–. After. assembly. of. all. the. gas. con-
nections,. these. must. be. tested. for.
soundness,. using. soapy. water. or.
appropriate. products.. DO. NOT. USE.
NAKED.FLAMES..
Preventive  maintenance  and  checking 
of  efficient  operation  of  equipment 
and  safety  devices  must  be  carried  out 
exclusively by authorized technical per-
sonnel.
Fig..12

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Rmg 80 mk.iiRmg 90 mk.iiRmg 100 mk.iiRmg 110 mk.ii

Table des Matières