Télécharger Imprimer la page

Put The Sensor Into Operation - ProMinent DULCOTEST BCR 1-mA-0.5 ppm Guide De Montage Et De Service

Publicité

Les langues disponibles

Les langues disponibles

6

Put the sensor into operation

User qualification: trained user, see
n
CAUTION!
Incorrect metering due to sensor failure
Possible consequence: Slight or minor injuries. Material damage.
If a sensor fails then there may be an incorrect reading at the input of the con‐
troller/measuring
This may result in uncontrolled metering
Therefore, the operator should make sure that no subsequent damages can
result from this
CAUTION!
Incorrect metering due to premature ageing of sensor
Possible consequence: Slight or minor injuries. Material damage.
Measure: Do not electrically disconnect the sensor during measuring breaks.
Exception: If there is a break between measurements lasting more than a week and
the proportion of disinfectant in the sample water falls during this period to 0 ppm
then you must electrically disconnect the sensor.
An extra run in period will be necessary following operation without disinfectant.
Switch on metering equipment with a time delay if necessary.
Run-in period
The sensor requires a specific run in period to display a steady display value.
Initial commissioning:
Recommissioning:
Electrolyte or membrane change:
* the exact run-in time depends on the application.

Put the sensor into operation

Ä Chapter 1.3 'Users' qualifications' on page 38
1 - 24 h (typically 6 h)*
1 - 24 h (typically 6 h)*
1 - 6 h
49

Publicité

loading

Ce manuel est également adapté pour:

Dulcotest bcr 1-ma-2 ppmDulcotest bcr1-ma-10 ppm